91ÑÇÉ«

Skip to main content Skip to local navigation

91ÑÇÉ« Lanes construction will see temporary closure of Colonnade doors

Construction activities starting May 2 will require the closure of Colonnade access doors from The Common. The doors from the Common to the Colonnade on the west end of 91ÑÇÉ« Lanes will be blocked by construction fencing.

Image shows the area affected by the construction activities at 91ÑÇÉ« Lanes

Image shows the area affected by the construction activities at 91ÑÇÉ« Lanes

Pedestrians who normally access these doors will be required to use alternate routes. Signs will be posted to direct pedestrian traffic around the work area.

Why is work being done?

The work is being down to replace several areas of stucco and roof elements of 91ÑÇÉ« Lanes as part of ongoing building maintenance.

A black and white drawing of 91ÑÇÉ« Lanes

An illustration of 91ÑÇÉ« Lanes showing the areas of the roof that are under construction

For more information, contact YUDC Project Coordinator Nancy Boake at ext. 55675

Latest News

Tags: